Building Inspection Interactive Voice Response System (IVRS) Call Plan
Call: 850-891-1800
- You can make inspection requests until 11:55pm for next business day inspection
- You must have the permit number to use the system
- Please listen carefully to all menu options
You may make County Fire Inspection requests by contacting the City of Tallahassee, Building Inspection Division at 850-891-7001, options 2 then 4 (7:30am - 4:30pm, Monday - Friday).
Inspection Types And Codes
View and download this list as a PDF
Commercial and Residential Building Inspections |
Code |
Description |
100 |
Footing |
101 |
Setbacks |
102 |
Re-Bar |
103 |
Lintel |
105 |
Slab |
106 |
Exterior Sheathing |
107 |
Framing |
108 |
Firewall |
109 |
Insulation |
110 |
Drywall |
602 |
Routine Environmental |
604 |
Environmental Final * |
900 |
Building Final |
908 |
Fire Final ** |
909 |
Driveway Final |
929 |
Retaining Wall Final |
930 |
State Fire Marshal Final** |
931 |
Foundation Only Final |
Sign Inspections |
Code |
Description |
114 |
Sign Footing |
906 |
Sign Final |
Window / Door / Siding Inspections |
Code |
Description |
928 |
Window, Door, Siding Final |
Demo Inspections |
Code |
Description |
604 |
Environmental Final* |
932 |
Demo/Move Final |
Manufactured Homes |
Code |
Description |
101 |
Setbacks |
120 |
Driveway Connection |
408 |
Mobile Home Sewer |
409 |
Mobile Home Water |
501 |
Electrical Release |
604 |
Environmental Final |
904 |
Mobile Home Final |
909 |
Driveway Final |
Pool Inspections |
Code |
Description |
111 |
Above Ground Pool, Spa or Hot Tub |
112 |
Fence & Gate |
113 |
Pool Re-liner |
117 |
Pool Wall |
900 |
Building Final |
Temp Storage Container Inspection |
Code |
Description |
919 |
TPSC Final |
Electrical Inspections |
Code |
Description |
200 |
Electric Rough-In |
201 |
Rough Ceiling |
202 |
Electric for HVAC Change Out |
203 |
Service Change Out |
204 |
Pool Electrical Bonding |
210 |
Alternate Power Source |
500 |
Temporary Power |
501 |
Electric Release |
901 |
Electric Final |
921 |
Solar PV Final |
Gas Inspections |
Code |
Description |
300 |
Gas Piping Test *** |
502 |
Gas Meter Set** |
902 |
Gas Final** |
Mechanical Inspections |
Code |
Description |
301 |
Ductwork Inspection* |
302 |
Rangehood** |
303 |
Refrigeration** |
304 |
Ventilation** |
306 |
HVAC Change-out** |
307 |
Boiler** |
310 |
Chillwater/Hot Water/Steam** |
903 |
Mechanical Final* |
Plumbing nspections |
Code |
Description |
400 |
Building Sewer/Septic |
401 |
Slab Rough-In |
402 |
Rough-In |
403 |
Tub-Set |
404 |
Water Heater |
410 |
Backflow Device |
407 |
Water System |
905 |
Plumbing Final |
Roofing Inspections |
Code |
Description |
115 |
Deck Re-Nailing |
116 |
Secondary Water Barrier |
917 |
Roof Final |
Alternative Energy Inspections |
Code |
Description |
200 |
Electric Rough-In |
300 |
Gas Piping ** |
402 |
Plumbing Rough-In |
924 |
Alternative Energy Electrical Final |
925 |
Alternative Energy Gas Final ** |
926 |
Alternative Energy Plumbing Final |
927 |
Alternative Energy Permit Final |
*If Commercial cannot be scheduled using IVR
** Cannot be scheduled using IVR
*** Only be scheduled using IVR if it's New and Addition Residential