Victory Garden Drive Sidewalk Improvements
The Victory Garden Drive Sidewalk Improvements project will provide a new sidewalk along Victory Garden Drive from Apalachee Parkway to Park Avenue.
These improvements are in the design phase. The design has a 6’ wide sidewalk with separation from the road along the west side of the roadway.
Project Details
Project Goal
- Provide increased pedestrian connectivity along Victory Garden Drive from Apalachee Parkway to Park Avenue
Typical Section
- Six-foot-wide sidewalk with separation from the roadway
- Street trees where possible
- Enclose existing ditches on one side of the roadway
Project Schedule
- Design: Anticipated to be completed in Winter 2023
- Construction: Anticipated to begin in Spring 2024
Project Exhibits
Click each graphic to view a larger version
Typical Section:
Concept 1 of 2:
Concept 2 of 2: