2 Think About Personal Pollution (TAPP)
The TAPP (Think About Personal Pollution) Campaign is an ongoing water quality enhancement project originally funded through a Section 319 Nonpoint Source Management grant from the US-EPA. The Campaign is a multi-media and community outreach effort, which surveys indicate has been successful in reducing stormwater pollution that reached our lakes, streams, and ponds.
FY2017 Budget: $125,000
2017 Maintenance Resurfacing
Historically, funding for street maintenance was allocated on a “worst first” strategy based on a roadway condition index. As a consequence, the typical treatment for those roads in the worst condition ranged from milling and resurfacing to total reconstruction. Unfortunately, these treatments are also by their nature the most costly. By allocating the limited available funding in this manner, fewer roadway miles can be addressed in a given year. This results in more deterioration of a greater percentage of the existing roadways and a gradual but persistent decline in the overall condition of the community’s roads.
FY2017 Budget: $500,000
2017 Maintenance Sidewalks
UUPI is responsible for nearly 500 miles of sidewalks within the city limits. These sidewalks are subject to deterioration from vehicular loading, tree roots, and other age and environmental impacts. Historically, the City has not used a program approach for sidewalk maintenance. Repairs have generally made based on citizen calls or are associated with other improvements scheduled in the area. There is not currently a process in place for systematic review of existing sidewalk conditions, nor is there identified funding specifically allocated for sidewalk repair. Staff is currently developing a scope for a consultant to provide sidewalk assessment and recommendations, similar to that proposed for pavement management. The goal is to develop and maintain a comprehensive inventory of sidewalk maintenance needs and to recommend a funding strategy to adequately address the ongoing maintenance issues associated with this important asset.
FY2017 Budget: $825,000
Alternate Fuel Program
Underground Utilities often designs, constructs, and expands its natural gas mains to provide service to outlying areas. Gas Administration has outlined a strategic plan to incorporate alternative fuels programs for dispensing compressed natural gas/liquid propane to economically feasible end-users, as well as deferring system expansion costs in outlying areas when alternative fuel delivery is a cost feasible option to distribution customers. This program is required to keep invested state licenses active and in full effect during the next fiscal year. Appropriations will also cover a cost feasibility study to be conducted prior to the implementation of the program
FY2017 Budget: $50,000
Automation Implementation
This project involves the development and implementation of a Geographic Information System (GIS) database mapping and facility inventory system for the department's Gas, Water & Sewer Utilities. Funding is provided for field surveys to locate existing gas valves/facilities, quality assurance/quality control gas facilities, modeling, prepare data input and editing, integration to GIS from engineering designs and documents, purchase and maintain gas applications pertaining to leak surveys and cathodic protection, purchase and maintain hardware and software pertaining to gas applications, purchase hardware and software pertaining to locating facilities, staff training, gas code compliance suite, mobile GIS, mobile GPS, work management, and field force automation.
FY2017 Budget: $332,500
Backflow Reimbursement Program
Changes from the Chapter 21, Article VIII, Division 1, Sec 21-261 Cross Connection Code amendment provide better incremental enforcement options to achieve customer compliance with testing customers’ backflow prevention assemblies (BFPA’s) other than discontinuance of water service. One option for residential customers to comply with testing their BFPA’s is to participate in the “Opt-In” Testing Program. Under this program, the biennial (every two years) backflow test will be performed by an approved tester under contract with the City of Tallahassee for which a cost of $3.00 per month will be applied to the customer’s monthly utility bill. The water service customer will remain registered in the program until written cancellation is received from the customer. Customers who have failed to have their devices tested and are delinquent after two notices will automatically be enrolled in the program. Funding represents an expected 50% participation of residential customer.
FY2017 Budget: $249,000
Briarwood Subdivision Ditch Stabilization (Blue Bay Lane)
The 1000 foot section of ditch running through the Briarwood subdivision has eroded to the point that it is affecting several homes. The ditch does not only affect adjacent properties but it can also affect water quality and the Cities National Pollutant Discharge Elimination System (NPDES) permit. This ditch reaches of the Lafayette Creek drainage system. Stormwater is conveyed from the area south of Apalachee Parkway and east of Capital Circle SE through the Briarwood Subdivision and eventually to upper Lake Lafayette. The ditch is currently unimproved and the cross over pipe under Blue Bay Lane is rusted out. The proposed design will include stabilization of the ditch banks and replacement of the crossover pipes under Blue Bay Lane. In FY 2014, Public Works Drainage Operations was working to obtain drainage easements through the subdivision. Project cost is based upon our staff engineer's estimate.
Future Funding
C.K. Steele/Governors Walk
Governor’s Walk will be built down Adams Street from Tennessee Street to Brevard Street. The project is anticipated to be completed in two years. The first year includes the design and permitting process for each phase of the project and the second year will initiate construction for project completion. Information for this project was requested at the June 20, 2016 City Commission Budget Workshop.
FY2017 Budget: $250,000
Carbon Bed Replacement
The City has five active granular activated carbon (GAC) units located at water well facilities which are used to remove ground water contaminants. The need to change the carbon is related to water demand and other factors. Exchange of the GAC is expected to be an ongoing process with these units. GAC units are closely monitored for Florida Department of Environmental Protection compliance by the Water Quality Division. Chemical analyses indicate carbon replacement schedules. Carbon planned for replacement includes FY17 - Well 9, FY18 - Wells 6, 7 and 13, FY19 - Wells 2 & 4.
FY2017 Budget: $200,000
CCSE Air Release Valve Change
Water Resources Engineering has developed construction plans to replace the six (6) remaining cast iron ARVs on the 42” forcemain due to corrosion damage. Replacement ARV will be stainless steel or equivalent.
FY2017 Budget: $200,000
Collection System Rehabilitation/Replacement
Sewer collection infrastructure must be rehabilitated or replaced to extend the expected life and reduce stormwater infiltration and inflow. These projects are prioritized each year based on maintenance reports, with design and construction usually done in-house and coordinated, when possible, with roadway projects. This is a recurring project. Annual appropriations that are not expended prior to the end of the fiscal year will be returned to fund balance.
FY2017 Budget: $2,775,000
Correction of ADA Deficiencies
Since the 1992 enactment of the Americans with Disabilities Act (ADA), many developments within the City of Tallahassee and Leon County have been constructed and accepted by the city for ownership and maintenance even though portions of the sidewalk systems did not comply with the ADA. For the past ten years, as City staff, area developers and local contractors have become more familiar with the technical requirements of full compliance and as the City’s development acceptance process better addresses this issue, the recurrence of this situation has been, and will continue to be, diminished. There remains a large inventory of sidewalks that are not compliant with the ADA within subdivisions for which the City is responsible for maintaining the right-of-way. This capital program request seeks to obtain a recurring funding source that can be proactively utilized to correct these deficiencies by addressing the most flagrant deficiencies first with the ultimate goal of seeking full compliance. If approved, annual appropriations that are not expended prior to the close of the fiscal year will be returned to the fund balance.
FY2017 Budget: $100,000
DEP In-Kind Services
The definition and scope are unknown at this time. FDEP has not finalized the Amended Consent Order with civil penalties. An in-kind project must be either an environmental enhancement, environmental restoration or a capital/facility improvement project. A project has not yet been determined.
FY2017 Budget: $50,000
Digester 3 Rehabilitation - Heating, Mixing, Cover Modifications
Digester number three needs new heating system, mixing system, cleaning and cover modifications. Specialty inspection and design services are needed.
Future Funding
Effluent Pond 5 Liner Replacement
Effluent Storage Pond 5 is in need of a pond liner replacement. The existing liner is past the life expectancy and is damaged beyond repair.
FY2017 Budget: $ 2,500,000
Enhanced Asphalt Treatment Maintenance Program
Approximately twelve years ago, the City applied stamped and painted asphalt treatments to selected roadways and intersections throughout the downtown area. Since that time, additional surface treatment enhancements, primarily at pedestrian crosswalks, have been included with some of the newer projects, such as along Gaines Street and Monroe Street. Although Monroe Street is owned by the FDOT, the City has agreed to maintain the crosswalks in exchange for the FDOT paying for the initial installation. Public Works is currently in the process of considering various treatments to be used for enhancing asphalt services. One of the first areas to be addressed once a treatment method is selected will be the Adams Street Commons area. This request is for a recurring annual appropriation that can be utilized to address those areas where the surfaces are most worn. This approach is recommended rather than a larger less frequent appropriation as the surface areas will wear out at differing rates depending on roadway usage and type of materials used. If approved, annual appropriations that are not expended prior to the close of the fiscal year will be returned to the fund balance.
FY2017 Budget: $ 250,000
Facility Building Improvements
This project involves scheduled and unscheduled improvements and maintenance for the Water Quality Facility. Among the recommendations proposed are additional building and roof repairs, parking lot improvements, mechanical system maintenance and repairs, and maintenance on the current security system. This is a recurring project. Annual appropriations that are not expended prior to the end of the fiscal year will be returned.
Future Funding
FAMU Way
This project involves the construction of a new 1.3 mile extension of FAMU Way from Wahnish Way to Lake Bradford Road and improvements to existing FAMU Way between Monroe Street and Wahnish Way to achieve the same standard. Phase I of the project extends from MLK Boulevard to Pinellas Street and the proposed typical section consists of 2 traffic lanes with bike lanes, parking and sidewalks on both sides. Phase II extends from Pinellas Street to the intersection of Gamble Street and Eugenia and the proposed typical section consists of 2 traffic lanes with bike lanes; plus parking and sidewalks on the east side and a multi-use trail by Blueprint on the west side. Phase III extends from Gamble Street to Lake Bradford and Phase IV extends at the east end of the project from MLK Boulevard to Monroe Street. Phase III and Phase IV typical sections are yet to be determined. The original budget for Phase III was based on minor costs for FAMU Way from the Gamble /Eugenia intersection to Lake Bradford, resulting from utilizing the existing Gamble Street corridor for this section with some additional landscaping. Staff has developed an alternate design, designated as Phase III, which would reconstruct and realign the stretch of FAMU Way south from Lake Bradford, and through the existing Wastewater Treatment Plant. This option would provide Blueprint 2000 opportunities to build a regional stormwater facility (for water quality and floodplain management) between the road and the existing CSX railroad tracks. The additional cost required for this redesign is shown by year below.
Future Funding
Frenchtown Drainage System Improvements
Proj. 02279 was advanced funded from SW fees, with BP2000 funds expected to reimburse the SW fund for the required match ($1,346,236) of the EPA grant ($1,645,400) obtained per the 10/10/01 agenda item approved by the CC. The planned total future appropriation is $11,645,400 w/$10,000,000 funded from BP2000 revenue thru FY2011 funding the Frenchtown project, and zero funding from the SW fund.
FY2017 Budget: $50,000
Gadsden Street - Harrison Street to Magnolia Street
This project will construct a sidewalk on South Gadsden Street between Harrison Street and Magnolia Drive. It is a highly ranked project on the City’s Prioritized Sidewalks list and will improve sidewalk connectivity within Tallahassee’s south side.
Gas Recurring Projects
The Gas Utility Division performs a variety of capital project activities designed to meet recurring operating requirements. Projects include procurement of meters for new service requests, replacement of obsolete meters, and repaving of utility cuts. This is a recurring project. Appropriations that are not utilized to fund specific projects prior to the end of the fiscal year will be returned to the fund balance.
FY2017 Budget: $ 1,781,637
Gas Service Request
This project provides funding for repairs to gas mains from damages made by gas customers. The estimates are based on historical expenditures for this type of activity and all expenditures will be fully reimbursed by gas customers. Costs for repairs will be billed through the city's billing and accounts receivable process. This project is also used for the City's Internal Piping Program whereby the City contracts with a local plumber to install internal gas piping. The City is fully reimbursed by the customer for this service; the City also adds an administrative fee for this service. Costs for this program will be billed through the city's billing and accounts receivable process. This is a recurring project. Annual appropriations that are not expended at the end of the fiscal year will be returned to the fund balance.
FY2017 Budget: $50,000
Gas System Expansion
This project funds the expansion of the gas distribution system serving residential, commercial, and industrial customers. Prior to opening any projects, the department will develop a payback analysis for each individual project. This is a recurring master project. Appropriations that are not utilized to fund specific projects prior to the end of the fiscal year will be returned to the fund balance.
FY2017 Budget: $1,272,050
Glendale Storm Retrofit
The Glendale neighborhood is located at the northwest corner of Thomasville Road and Bradford Road. The neighborhood, originally plated in 1939, consists of Forest Avenue (North Forest, West Forest, and East Forest), Florida Avenue, and Laurel Street with approximately 85 residences.
Initially, the neighborhood was selected for a resurfacing project, but the utility coordination process identified a need for water and sewer improvements. Through the public outreach related to the utility project, many residents expressed concerns about stormwater problems that plagued the neighborhood and they requested the City address the problems. Over a period of several weeks, staff conducted multiple site visits during rain events to observe runoff and other existing drainage conditions with the ultimate goal of determining the scale of the improvements needed and identifying any existing infrastructure in need of maintenance.
Observation revealed the scale of the stormwater improvements was too large to include with the resurfacing project and needed to be a standalone capital project. The stormwater improvements will address the following issues: (1) the lack of existing infrastructure contributes to standing water in the road and on private property; (2) elevation differences between the roadway and adjacent properties allows runoff to leave the roadway and flow onto private property resulting in excess erosion and sediment loss; (3) existing ditches, culverts and other infrastructure are undersized and do not meet current level of service standards; (4) stormwater runoff cannot efficiently enter the outfall system on Thomasville Road.
Funding is requested to cover the costs of constructing the stormwater improvements for the neighborhood which may include curb and gutter, ditch stabilization, inlets, and other enclosed conveyance system enhancements. The resurfacing will be funded separately from the annual, recurring street resurfacing project. The street resurfacing will be completed in conjunction the stormwater improvements. Design for the project is being funded out of FY 2015 monies made available by the Stormwater Division. Funding for construction is requested for FY 2016 and the estimated cost for construction is $750,000.
FY2017 Budget: $350,000
Grit Chamber Equip. & Screen Sys.
Purchase third grit chamber equipment and third mechanical screen equipment. This is a recurring project. Annual appropriations that are not expended prior to the end of the fiscal year will be returned.
FY2017 Budget: $2,000,000
High-Pressure System Upgrade
This project provides funding for engineering, purchases of equipment, staff training, construction, and related activities associated with the expansion, additions or improvements to the gas high-pressure facilities. Activities also include replacement of remote terminal units (RTU) at various locations, updating and maintaining the gas hydraulic model through the purchase of new hardware/software, and training.
FY2017 Budget: $115,000
Inflow Monitoring and Testing
This project supports the identification of sources of infiltration or inflow into the sanitary sewer system. Identification methods include smoke testing, monitoring flows, and televising. This is a recurring project. Annual appropriations that are not expended prior to the end of the fiscal year will be returned to fund balance.
FY2017 Budget: $300,000
Jackson Bluff Road Reconstruct
Jackson Bluff Road from Essex Drive west to Century Park Drive shows significant deterioration and needs to be reconstructed. The current degraded condition of the pavement is a direct result of poor subgrade conditions. To properly repair this roadway, a full depth reconstruction with over excavation to remove the poor soils will be required. This scope of work and the associated costs warrant this project being addressed as a stand-alone capital improvement project rather than being addressed through the annual resurfacing program.
Future Funding
Lower Central Drainage Ditch Erosion Control Project
The project objective is to address severe erosion along the Central Drainage Ditch (CDD) from Gamble Street to Springhill Road. The most severe erosion is from Kissimmee Street to Springhill Road. The majority of the CDD is under private ownership, so land acquisition will be required. It is envisioned that the solution concept will consist of armoring the bottom and sides of the ditch with Gabions with maintenance access paths and fencing along both sides of the ditch.
Future Funding
Maclay Commerce Dr./ Maclay Blvd. Street Imp.
This project will include improvements to Maclay Commerce Drive and Maclay Boulevard. These improvements will support additional Placemaking initiatives proposed for the Market District. Improvements may include multiple roundabouts, landscaping and enhanced pedestrian features.
FY2017 Budget: $350,000
Madison Street and Gaines Street Supplemental Stormwater Outfall
This project proposes to construct a large storm drain pipe in Bicycle Boulevard between Madison Street and Gaines Street to provide additional stormwater conveyance for redevelopment, improve the stormwater system's level of service and reduce the potential for flooding of Gaines Street. Runoff from the downtown area is conveyed in an underground piping system and is discharged to a regional stormwater facility on Lake Bradford Road. During intense rainfall events when the underground piping system cannot accept anymore runoff, runoff will flow overland to the recently redeveloped Gaines Street corridor. Projected costs are engineer’s estimates based upon historical property acquisition, engineering design and construction costs.
FY2017 Budget: $2,000,000
Market Square Pond Improvements - BPRK
Improvements to existing retention pond facilities and adjacent green space, located at Maclay Commerce Drive and Maclay Boulevard South, such that it can be used as part of an ongoing effort to reclaim public spaces and develop urban parks around existing stormwater facilities.
FY2017 Budget: $8,365,000
Master Sewer Plan Improvements
This project is to construct major sewer infrastructure, including pumping stations, force mains, and gravity sewer mains, to provide city sewer services in accordance with the 2035 Sewer Master Plan. Individual projects will be established based on the capital project phasing included in the Master Plan. This is a master recurring project. Funds that are not expended prior to the end of the fiscal year will be returned to fund balance.
FY2017 Budget: $2,260,000
Master Water Plan Improvements
This project funds the construction of water distribution infrastructure in accordance with the 2010-2030 Water Master Plan. Improvements identified in the plan include major upgrades and replacement of distribution piping and water production/storage facilities to maintain proper water capacity and system pressure to provide adequate fire flows, maintain good water quality, and address future growth. Individual projects will be established based on the projected capital project program included in the Master Plan. This is a recurring project. Annual appropriations that are not expended prior to the end of the fiscal year will be returned to fund balance.
FY2017 Budget: $ 4,060,000
McCord Pond Ditch Improvements
Ditch erosion has enlarged the ditch to a point that encroachment into the adjacent residential and commercial properties is beginning to occur. This ditch runs northeast from Betton Road, behind residential properties on Trescott Drive and commercial properties on Thomasville Road, behind the Circle K on Thomasville Road near Betton Road. The ditch is in a 48-foot wide right-of-way and is approximately 10 feet deep with nearly vertical side slopes. The ditch is 1,250 feet in length and affects 11 residential and 5 commercial properties. Access to this ditch is at the north end at Post Road. Any stabilization maintenance required (placement of sandbags, installation of rip rap, etc.) must be done by hand. Preliminary design would install a 7-foot by 15-foot box culvert. The estimated cost of construction is $1,884,000 and the estimated cost of design is $188,400. Total cost is estimated at $2,072,400. We are requesting the design and construction funding over two years as this is a relatively large project will require design and construction over two fiscal years. Funds requested for FY2017 are for the design. Construction funds will be requested for FY2018. This project's cost estimate was made according to staff's knowledge of the cost of similarly sized projects.
FY2017 Budget: 188,400
Medium Stormwater System Improvements
This project provides funding for medium sized stormwater problems to be addressed in a timely manner. Problem areas are analyzed under the Small Project Initiative Program (SPI) and at times the solution exceeds the resources allocated to the SPI Program. This project provides construction funding for these somewhat larger (medium sized) stormwater problems to be addressed in a timely manner. Projected costs are engineer’s estimates, based upon Water Resources Engineering historical project construction costs. This is a recurring project. All appropriations not expended prior to the end of the fiscal year will be returned to fund balance.
FY2017 Budget: $2,500,000
Minor Stormwater Improvements
The recurring project’s scope is to resolve various minor stormwater problems that occur during the year. These are maintenance and minor improvements to the stormwater infrastructure system including, but not limited to: material acquisition, permitting, design and land acquisition. The National Pollution Discharge Elimination System (NPDES) Permit requires that 62 of the entire stormwater system be inspected annually. Also, the Northwest Water Management District (NWFWMD) testing requirements will increase as new facilities are accepted for maintenance. These increased levels of inspections will inevitably reveal additional maintenance requirements. Construction costs continue to increase due to the economic environment and cost of raw materials. Annual appropriations not expended to the end of the fiscal year will be returned to the stormwater fund.
FY2017 Budget: $425,000
Miscellaneous Stormwater Engineering
Drainage Basin: City Wide. This project provides a source of funding for various miscellaneous stormwater problems or issues, which the Stormwater Division is called on to address, and which are not funded in the capital improvement plan (CIP). Typically, this work requires some engineering, surveying or other services and this project provides the Stormwater Division with a funding source to provide those activities. This is a recurring project. Annual appropriations that are not expended prior to the close of the fiscal year will be returned to fund balance.
FY2017 Budget: $80,000
Myrick Road Outfall Ditch Improvement
Over the years, erosion has enlarged the ditch to a point that encroachment into the adjacent residential properties has had to be addressed in the past and continues to approach other properties. This ditch runs behind houses on both Myrick Road and Rhonda Drive. The ditch is in a 20-foot wide right-of-way and is 6 feet deep with nearly vertical side slopes. It is 1,200 feet in length and affects 21 residential properties in the Forrest Heights/Holly Hills neighborhood. The only access to this ditch is at the east and west ends and requires the drainage weed and brush crews to mow the ditch by hand utilizing weed eaters. Any stabilization maintenance required (placement of sandbags, installation of rip rap, etc.) must also be done by hand, utilizing wheelbarrows and the inmate crew.
Preliminary design would install a 42-inch RCP with five structures. The estimated cost, including the design fees, is $232,000.00. Design and construction funding are budgeted within the same year as because this is a relatively small project can be completed within one fiscal year. This project's cost estimate was made according to staff's knowledge of the cost of similarly sized projects.
FY2017 Budget: $50,000
New Mobile Work Management
This project will provide funding for the replacement of the current Mobile Work Management application in use by Underground Utilities. This application is nearing end of life and is in need of replacement.
FY2017 Budget: $125,000
Northwest Tank Construction
Construction of a one-million gallon elevated storage tank to meet future demands based on projected population growth in the northwest area. This is a specific project which will require appropriations in multiple years.
Future Funding
Northwest Water Quality Initiative
Underground Utilities customers have been experiencing discolored drinking water in the northwest water service area. The discoloration is a result of buildup of naturally occurring iron in the distribution system, causing the pipes to require cleaning to be renewed to the customer service level expected of us. Approximately 100 miles of distribution pipe and three water supply wells serve this area which need to be routinely cleaned and/or rehabilitated. Underground Utilities Engineering and Operations are working closely together to identify the sources/causes of the water quality problems and to develop and implement solutions to provide customers the same high quality water as experienced throughout the City. This is a recurring project. Annual appropriations that are not expended prior to the end of the fiscal year will be returned.
FY2017 Budget: $125,000
Nova 2010 Sidewalks
This project provides for constructing sidewalks on proposed bus routes in support of StarMetro's Nova 2010 initiation.
Future Funding
NPDES Municipal Stormwater Per
This is an ongoing project associated with permit compliance imposed by the State of Florida.
FY2017 Budget: $125,000
Nurse's Drive
This project involves construction of a new (.4-mile) two-lane street on right-of-way donated by Tallahassee Memorial Regional Medical Center (TMRMC) from Centerville Road to TMRMC's extension of Surgeon's Drive. The new two-lane curb and gutter street would include bike lanes and sidewalks and provide a connecting link between Centerville Road and Miccosukee Road via Nurse's Drive and Surgeon's Drive. Right-of-way documents have been signed by TMRMC, but will not be recorded until Surgeon's Drive extension is built by TMRMC and accepted by the City, at which time the city has 10 years to let a construction contract for Nurse's Drive or its right-of-way will revert back to TMRMC.
Future Funding
Pershing Street - Adams Street
This project will construct a sidewalk on Pershing Street between Adams Street and Monroe Street. It is a highly ranked project on the City’s Prioritized Sidewalks list and will improve sidewalk connectivity within Tallahassee’s south side.
Future Funding
Pipeline Cleaning
Underground Utilities customers have recently been experiencing discolored drinking water in the northwest service area. While not the root cause of the discoloration, the discoloration is a result of buildup of an iron-reducing biofilm in the distribution system causing the pipes to require cleaning to be renewed to the customer service level expected of us. Approximately 100 miles of pipe need to be cleaned and rejuvenated. Historically we have used a third party vendor for this major renewal process (the last time was about 10 years ago). After significant research and a pilot project is was determined that it would be less costly do train staff, purchase equipment, and undertake this major project in-house, and that the quality of the work and customer service is increased. This gives us the advantage at the end of the process to utilize the equipment and staff to make pigging appropriate pipe a normal part of our operations thus avoiding the need to future major cleaning efforts.
FY2017 Budget: $100,000
Pump Station 12 Force main
This project entails the design, environmental permitting, easement acquisition, and construction of a new sanitary sewer forcemain beginning at Pump Station 12 on West Orange Avenue and terminating in the vicinity of Pump Station 149 on Springhill Road.
FY2017 Budget: $1,025,000
Pump Station Renovation & Maintenance
The Distribution and Collection Division operates and maintains 107 pumping stations. Pumping stations are scheduled for periodic maintenance and upgrades based upon the age and condition of the grounds, structures, and/or equipment. This is a recurring project. Annual appropriations that are not expended prior to the end of the fiscal year will be returned.
FY2017 Budget: $850,000
Pumping Station Replacement Master Project
The City operates 112 pumping stations in the sewer collection system and annually prioritizes those stations due for replacement or major upgrades. This project provides for the design, purchase and installation of equipment and structures to adequately and reliably pump sewage throughout the collection system. This is a master recurring project. Annual appropriations that are not expended prior to the end of the fiscal year will be returned to fund balance.
FY2017 Budget: $525,000
Railroad Avenue
This project will provide for reconstruction of 0.25 mile of Railroad Avenue as a revitalized connection between FAMU Way and Gaines Street. This project will be a component of the Gaines Street revitalization efforts. Improvements will include enhanced bike and pedestrian amenities, possible lane relocations, enhanced lighting and landscaping and the conversion of overhead utilities to underground facilities along the corridor.
Future Funding
Rainfall and Stream Gauging - Stormwater Project
The program is funded through a joint agreement among the City, Leon County, and the Northwest Florida Water Management District. The project is an annual recurring project to gather rainfall and stream flow data necessary to continually update stormwater computer models and to ensure reliability of designs. This is a recurring project. Annual appropriations that are not expended prior to the close of the fiscal year will be returned to fund balance.
FY2017 Budget: $111,000
Refurbish Pivots 1 2 & 5
Refurbish sprayfield pivots and upgrade the 13 original water valve boxes with new control valves, ARV (air release valves, and isolation valves.
FY2017 Budget: $40,000
Residential Sidewalks and Bike Ped Implementation Program
This project combines funding authorized by City Commission Policy 600CP for the Sidewalk Program and for the City Commission authorized Traffic Calming Program. Revisions to the traffic calming program approved by the City Commission have significantly reduced the number of projects that qualify for funding. Emphasis is placed on sidewalk improvements including in-fill sidewalks and missing link segments. It is anticipated that these funds will be used to supplement the design and construction of sidewalk projects through the Multimodal projects priority list. All sidewalks and ramps constructed must meet the Americans with Disabilities Act (ADA) criteria. These funds also support the Street Resurfacing Program on the construction of sidewalk / ADA ramps. This is a recurring project. Annual appropriations that are not expended at the end of the fiscal year will be returned to the fund balance.
FY2017 Budget: $580,800
Roadway - Raymond Diehl Road PASS
The Raymond Diehl Road PASS project will improve pedestrian, bicycle and vehicular roadside safety along the Raymond Diehl Road corridor from Killearn Center Blvd. to Olson Road. Currently the roadway has deep open ditches and drop offs adjacent to the travel lanes along portions of the roadway. The project will consist of adding curb and gutter, closing the roadside ditches, installing stormwater inlets and conveyance, constructing a new sidewalk along the one side of the roadway and bicycle lanes throughout the project limits.
FY2017 Budget: $1,300,000
Roadway - Richview Road Pass
The Richview Road PASS project will improve pedestrian, bicycle and vehicular roadside safety along the Richview Road corridor from Apalachee Parkway to East Park Avenue. The project will consist of adding curb and gutter, closing the roadside ditches, installing stormwater inlets and conveyance, a new sidewalk along the one side of the roadway and bicycle lanes from Apalachee Parkway to Spring Forest Road. Additional sidewalk improvements will be constructed from Spring Forest Road to Park Avenue to comply with the Americans with Disabilities Act. This corridor is an important link for adjacent residential subdivisions to access transit on Apalachee Parkway.
FY2017 Budget: $1,100,000
Roundabout Intersection Kerry
The roundabout at the intersection of Kerry Forest Pkwy and Shannon Lakes Dr. serves approximately on average 24,000 vehicles per day. The existing pavement within the roundabout is exhibiting several deformations including rutting, shoving and an increase in cracking. It is impractical to perform maintenance on the roundabout at this time because any maintenance would not be cost effective and would only provide a temporary and short-term fix.
We are requesting funding for the design and construction of replacing the current roundabout with concrete. The estimated costs for design and construction of this project are $380,000 ($80,000 for design in 2019. and $500,000 for construction in 2020).
Future Funding
Royal Oaks Creek Stormwater Improvements
Definition and Scope - The project objective is to alleviate structural flooding, yard flooding and erosion of several residential properties located adjacent to the Royal Oaks Creek. Additionally, this project will evaluate options that address the severe erosion of properties and stormwater outfalls abutting the watercourse; and thereby reduce the sediment transport downstream towards the Killearn Chain of Lakes. The project will also evaluate the potential to remove previously deposited sediments from ditches and ponds within the system.
FY2017 Budget: $750,000
Sewer Line Relocation/Adjustment for Roadways
Sewer collection infrastructure in conflict with proposed roadway and stormwater facility improvements must be relocated and adjusted. The scope and cost of these relocations/adjustments vary with each project and cannot be accurately determined until final construction plans are available. The projected five-year funding levels are based on preliminary Florida Department of Transportation, Blue Print 2000, Leon County, and City Public Works schedules and on historical cost experience. This is a recurring project. Annual appropriations that are not expended prior to the end of the fiscal year will be returned to fund balance.
FY2017 Budget: $2,171,925
Sewer System Infrastructure Expansions & Upgrades
This project will fund minor sewer infrastructure expansions associated with land development activities. It involves refunds to developers for on-site and off-site activities including pipeline additions/adjustments as well as construction and/or modifications to pump station. This is a master-recurring project. Annual appropriations that are not expended prior to the end of the fiscal year will be returned to the fund balance.
FY2017 Budget: $1,040,000
Short Street Stormwater Improvements
Short Street and Alachua Avenue periodically flood; and several residential properties are known to have yard, garage and basement flooding. The storm drain system serving this area is at the end of its design life, and in need of repair and/or replacement.
Future Funding
Sidewalk - Polk Drive
In December 2010, the Tallahassee City Commission approved staff’s recommendation to combine all planned pedestrian and bicycle project lists into a single consolidated list entitled the Planned Multimodal Project (PMP) list. Using the prioritization criteria, with safety serving as the number one priority, and evolving Commission priorities, three major sidewalk projects will begin this fiscal year on Putnam Rd., Polk Rd., and Shamrock Rd. These projects range from one to two years of construction.
FY2017 Budget: $200,000
Sidewalk - Putnam Drive
In December 2010, the Tallahassee City Commission approved staff’s recommendation to combine all planned pedestrian and bicycle project lists into a single consolidated list entitled the Planned Multimodal Project (PMP) list. Using the prioritization criteria, with safety serving as the number one priority, and evolving Commission priorities, three major sidewalk projects will begin this fiscal year on Putnam Rd., Polk Rd., and Shamrock Rd. These projects range from one to two years of construction.
FY2017 Budget: $535,000
Sidewalk - Shamrock Street
In December 2010, the Tallahassee City Commission approved staff’s recommendation to combine all planned pedestrian and bicycle project lists into a single consolidated list entitled the Planned Multimodal Project (PMP) list. Using the prioritization criteria, with safety serving as the number one priority, and evolving Commission priorities, three major sidewalk projects will begin this fiscal year on Putnam Rd., Polk Rd., and Shamrock Rd. These projects range from one to two years of construction.
FY2017 Budget: $1,400,000
Skyland Drive Outfall Ditch Improvement
Over the years, erosion has enlarged the ditch to a point that encroachment into the adjacent residential properties has had to be addressed in the past and continues to approach other properties. This ditch runs behind houses on both Skyland Drive and Devra Drive. The ditch is in a 20-foot wide right-of-way and is 8 feet deep with nearly vertical side slopes. The ditch is 800 feet in length and affects 14 residential properties. The only access to this ditch is at the north end requiring the drainage weed and brush crews to mow the ditch by hand utilizing weed eaters. Any stabilization maintenance required (placement of sandbags, installation of rip rap, etc.) must also be done by hand, utilizing wheelbarrows and the inmate crew. Preliminary design would install a 48-inch RCP with five structures. The estimated cost, including the design fees, is $183,000. We are requesting the design and construction funding all within the same year as this relatively small project can be designed and constructed within one fiscal year. This project's cost estimate was made according to staff's knowledge of the cost of similarly sized projects.
FY2017 Budget: $50,000
Small Projects Initiative
Drainage Basin: City Wide. This project provides funding for smaller stormwater problems to be addressed in a timely manner. To address this issue, a staff person has been assigned to work only on small projects. Projected costs are engineer’s estimates, based upon Water Resources Engineering historical property acquisition, engineering design, and project construction costs.
FY2017 Budget: $350,000
South City - Country Club Creek Stormwater Improvements
The project objective is to improve the stormwater infrastructure and level of service, specifically along Country Club Creek, in South City. The project will evaluate options to clean and address the severe erosion along segments of the Country Club Creek watercourse; thereby, reducing sediment transport downstream to Silver Lake and Lake Munson. The project will also evaluate, and if necessary upgrade, cross-drain culverts along the creek. The project may include the acquisition of abandoned, flood prone residential properties. A re-mapping of the FEMA Special Flood Hazard Area (SFHA) of the East Ditch and Country Club Creek will be provided if warranted by engineering analysis. Projected costs are engineer’s estimates, based upon historical property acquisition, engineering design and construction costs.
Future Funding
Storm Drain System Inspection/Rehabilitation/Replacement
This a master project that provides funding to inspect, and if necessary, repair or replace storm drain pipes and structures within City streets that are scheduled for resurfacing. Storm drain infrastructure has a service life which can be extended through timely inspection and rehabilitation. When rehabilitation is not feasible, replacement should be performed prior to street resurfacing. This storm drain RR&I work will also be coordinated with other City utility RR&I projects along streets that are not currently programmed in the City's resurfacing program. Additionally, the City's NPDES MS4 Permit requires annual inspection and maintenance of a minimum of 62 of the drainage infrastructure. This project will assist the City in achieving compliance with this component of the MS4 permit. Periodically, funds may be utilized to purchase, upgrade, and/or replace inspection equipment..
FY2017 Budget: $750,000
Stormwater Management Office Upgrades
This project will provide funding for miscellaneous repairs and capital improvements for the Stormwater Management office quarters in the Gemini Building. This work will include limited demolition and construction, including mechanical and plumbing retrofits, painting, carpet replacement, and furniture replacement.
FY2017 Budget: $613,400
Stormwater Pollution Reduction
The initial assessment and planning phase has been completed. However, the SPRP has transitioned into the implementation element of the program. The Division will continue to fund prioritization, feasibility studies and BMP monitoring via this project.
Future Funding
Street Resurfacing Program
"The purpose of this program is to resurface those City-owned paved streets that have been deemed, through the pavement management assessment process, to be in need of this action. The primary method used for this program is the conventional asphalt overlay. Cold milling of the existing surface is sometimes required. The recycled milled asphalt is a “green” method in that the milled material is re-used for based material. Another method we utilize is ""hot in place"" which also reuses the existing top surface which is a ""green"" process that further supports the City's recycling efforts. The work is performed by contractors that have been selected through the competitive bid process. City staff inspects the contractor’s work.
FY2017 Budget: $3,571,200
Thermo-plastic Marking Program
Thermo-plastic pavement markings, as opposed to painted markings, are a much more durable method for marking the city’s roadways. The life expectancy for thermo-plastic markings is six to ten years depending upon the roadways’ usage. The life expectancy for painted markings is six months to a year. However, with current work load, budget and staff, we are unable to complete even one cycle per year. Additionally, the thermo-plastic markings, because they incorporate glass beads in the fluid as it is applied, provides better initial reflectivity and better retains that reflectivity over the life of the application. This improves motorist safety. Using skip dash white striping as the baseline, the estimated contractual unit cost for thermo-plastic marking is $1,000 per mile. The estimated cost for painted markings is $190 per mile. If you assume that the paint cycle is completed every 9 months and compare it with thermo-plastic for an average 8 year cycle, the cost is $2,025/mile vs. $1,000/mile. Of course, there are other costs such as stop bars, crosswalks, solid white turn lanes, etc. The average unit cost for paint is approximately 2 times as much than thermo-plastic for the 8 year cycle.
For the past approximate 9 years, Public Works Operations has been applying thermo-plastic pavement markings as part of the resurfacing program. This decreases funds available for asphalt resurfacing. Because of this, this capital request is being made to develop a program designed to progressively apply and maintain thermo-plastic pavement markings to the streets of Tallahassee that previously have had painted markings.
FY2017 Budget: $40,000
Timberlane School Sidewalk
This project involves the construction of sidewalks on one side of the road on a portion of Timberlane School Road which lies within the City limits.
Future Funding
Total Maximum Daily Load (TMDL) Compliance
The Federal Clean Water Act requires that states identify impaired waters and that they develop programs to reduce pollutant loads in those waters. Nationwide, the programs being developed to address these requirements are called total maximum daily load (TMDL). Florida is moving forward with its TMDL program very rapidly in response to a court ordered schedule. This program could have significant financial impacts on the city. This project provides funding for engineering and administrative activities to develop strategies to address the regulatory requirements of the TMDL program, and to ensure that city interests are protected. Primary activities under this project would include developing necessary technical data and receiving water computer models, negotiating with the Florida Department of Environmental Protection and the Environmental Protection Agency (EPA), preparing TMDL implementation plans, and developing other programmatic elements.
Future Funding
Wastewater Collection Recurring Work Orders
Each fiscal year the distribution and collection division performs a series of capital projects that cover wastewater collection system activities listed below. This is a master recurring project. Annual appropriations that are not expended prior to the end of the fiscal year will be returned to fund balance.
FY2017 Budget: $2,793,500
Wastewater Treatment Improvements
Each fiscal year, the Wastewater Treatment Division performs various capital projects relating to the repair, replacement, and maintenance activities at the various treatment facilities. Project activities are listed below. Annual appropriations that are not expended prior to fiscal year end will be returned to fund balance.
Future Funding
FY2017 Budget: $850,000
Water and Sewer Engineering Office Upgrades
This project will provide funding for miscellaneous upgrades and capital improvements for the Water and Sewer Engineering office quarters in the Gemini Building. This work will include limited demolition and construction, including mechanical and plumbing retrofits, painting, carpet replacement, and furniture replacement.
FY2017 Budget: $536,600
Water Distribution Recurring Work Orders
Each fiscal year, the Distribution and Collection Division performs a series of capital projects, which cover water distribution system activities shown below. Fire hydrant maintenance is included in the Fire Department's CIP. This is a recurring project. Annual appropriations that are not expended prior to the end of the fiscal year will be returned to fund balance.
FY2017 Budget: $1,130,500
Water Distribution System Extensions and Upgrades
In FY2016 and prior years, this project was named Water Minor Line Extensions and Upgrades. The name is being changed to more accurately reflect the purpose of this project. This project will fund water distribution system extensions as well as development related reimbursements. It will also fund water main replacements and upgrades identified by maintenance and operating activities. This is a recurring project. Annual appropriations that are not expended prior to the end of the fiscal year will be returned to the fund balance.
FY2017 Budget: $1,105,000
Water Line Reloc./Adj. for FDOT/City/Leon County P/W
This project funds the relocation and adjustment of water distribution infrastructure that conflicts with proposed roadway improvements planned by City and County Public Works Departments, Blue Print 2000 and the Florida Department of Transportation. The scope and cost of these relocations/adjustments vary with each project and cannot be accurately determined until final construction plans are available. The projected five-year funding levels are based on preliminary FDOT, Leon County, Blue Print 2000 and City Public Works schedules and on historical cost experience. An engineering firm or water utility engineering staff will design and inspect each of these projects as needed. This is a recurring project. Annual appropriations that are not expended prior to the end of the fiscal year will be returned to fund balance.
FY2017 Budget: $1,155,000
Water Quality Bldg Relocation
This project provides for the design and construction of a new building, or an expanded, renovated facility, for the Water Quality building at the Thomas P. Smith Reclamation Facility. The original building was constructed in the mid-1970s and has had 3 major additions. The additions failed to address laboratory ventilation and air quality allowing lab fumes to travel to office and public areas. Previous addition did not address aging electrical systems, handicap accessibility, and safe work conditions. Some of the laboratory work benches are in poor condition and need to be replaced.
The laboratory is accredited through the National Environmental Laboratory Accreditation Program and provides valuable process data for the wastewater, drinking water and storm water systems. Having the laboratory part of Underground Utilities allows immediate service during critical investigations and special sampling events. The laboratory plays an essential role in meeting the City’s GreenPrint Initiatives Object NR1: Protect the groundwater resources of the City of Tallahassee by analyzing drinking water, wastewater, and storm water samples to better understand potential contaminates to our aquifer.
The original building was constructed in the mid-1970s and has had 3 major additions. Several components of the electrical and HVAC systems need to be replaced and many areas of the building need to be brought up to code.
The decision to construct a new building in a different location on the TPS site or to expand and renovate the existing facility will be decided after architectural evaluations are complete. A facility needs assessment has been completed and preliminary designs with cost estimates are expected to be completed.
The Water Quality laboratory provides analytical services to both the Water Utility and external customers, generating revenue. A more efficient laboratory will maximize revenue.
FY2017 Budget: $3,9500,000
Water Well and Elevated Tank Renovation & Replacement
This project supports improvements, upgrades, and emergency repairs at the various city water wells and elevated tanks. Currently, there are 27 water wells and 8 elevated water storage tanks in the city's water supply system. Rule 62-555.360 (operation and maintenance of public water systems) by the Florida Department of Environmental Protection requires that drinking-water storage tanks be inspected annually and cleaned at least once every five years to remove bio growths, calcium or iron/manganese deposits, and other debris from inside the tanks. The rule also requires inspection for structural and coating integrity at least once every five years by personnel under the responsible charge of a professional engineer licensed in Florida. The tanks also require annual cathodic protection inspection to help prevent corrosion.
FY2017 Budget: $795,000
Water Well Facilities Improvements
This project includes structural analysis of existing water well facilities and provides for repair and maintenance of the buildings that house chemicals, electrical motors and electrical control centers. The project also supports improvements and upgrades to the SCADA remote monitoring and control systems, Motor Control Centers (MCC), backup power generators and auxiliary engines at various city water wells. This project will also be used to fund future needs to clean and paint the systems elevated water tanks. The new control centers will allow better compatibility with today's technology to monitor additional safety and security equipment, to be compatible with newer software versions and to enhance remote monitoring and operations. Tank 1 is scheduled to be painted in FY18. Additional well/tank improvements are also anticipated.
FY2017 Budget: $400,000
Weems Road Extension
This project provides for the extension of Weems Road from Mahan Drive, northerly and westerly, to tie to a new section of Automotive Way built as part of the Mahan Villages Shopping Center.
FY2017 Budget: $773,000
Weems Road Pass
This project provides for the reconstruction Weems Road between Mahan Drive and Easterwood Drive as an urban street with curb and gutter, sidewalks and sharrow lanes to meet City standards for pedestrian and street safety (PASS). There will be a trail constructed along the east side of the roadway connecting the Goose pond trail to Mahan Drive. The construction of Phase 1 (Capital Circle N.E. to Railroad crossing) is complete. Design of Phase 2 (Railroad crossing to Mahan Drive) is underway. The project also includes improvements to the existing Weems Pond outfall and roadway crossing to address recurring flooding of the roadway.
Future Funding
Welaunee Plantation - Gas Main Extension
This project involves the design and construction of natural gas mains to provide service to Welaunee Plantation. This is a recurring project. Annual appropriations that are not expended at the end of the fiscal year will be returned to the fund balance.
FY2017 Budget: $142,300
Well 23 Treatment Construction
The northwest water distribution area is served by two water supply wells, one of which (Well 23) is out of service pending the addition of a treatment system. This project will fund the design and construction of a treatment facility to improve the aesthetics and quality of the water supplied by this well. This is a specific project which will require appropriations in multiple years. This funding is required to perform the rehabilitation efforts.
Future Funding
Zillah Street PASS (Roadway)
This project will improve pedestrian, bicycle and vehicular roadside safety along the Zillah Street corridor from Tram Road to Paul Russell Road. Currently the roadway has deep open ditches immediately adjacent to the travel lanes along the southern half of the roadway and shallower swales along the northern portion of the roadway. There is a sidewalk along the west side of the roadway throughout the project limits and a multi-use trail on the west side along the north half of the roadway. The project will consist of adding curb and gutter, closing the roadside ditches, installing stormwater inlets and conveyance, constructing a sidewalk along the east side of the roadway and bicycle lanes from Tram Road to Omega Avenue. There is a multi-use trail along Zillah Street from Omega Avenue to Paul Russell Road so bicycle lanes will not be constructed along this portion of the roadway.
Future Funding