As of November 16, 2016 -Area Light Policy — Change out of HPS to LED lights are allowed before the HPS fixture fails if the customer agrees to pay 100% costs for the change out. This cost will include all labor, equipment, materials, and overhead fees. Costs will be estimated per job and customer will be billed for actual costs after the work is completed. Fixtures that break and cannot be repaired, will continue to be replaced with LED fixtures