The City of Tallahassee's Water Utility is responsible for water, wastewater and stormwater operations. From flood prevention and resource preservation to ensuring the safe and dependable delivery of the highest quality drinking water, the City is committed to meeting the ever-changing needs of our community.
Report a Problem
Drinking Water Safety
Water Management
Stormwater Management Services
Wastewater Management Services
Water Quality Report
Cloudy Water? Flush Them Pipes!
Water Programs
Cross-Connection Control
Aquifer Protection
Monthly Fees |
Minimum Charge* |
$11.70 per month |
|
|
Usage Rates |
|
Tier 1: First 50 cgals** |
$0.174 each cgal** |
Tier 2: The next 51-150 cgals** |
$0.238 each cgal** |
Tier 3: 151 cgals** and above |
$0.300 each cgal** |
*Minimum charge includes customer charge ($) and 25 cgals of water usage.
**cgal - 100 gallons
These rates assume a 5/8" meter. For other meter sizes and rates, please call Customer Operations at 850-891-4968. Water surcharge outside City of Tallahassee - 50% |
Monthly Fees |
Meter Size |
cgals* Included in
Minimum Charge |
Minimum Charge |
5/8" Meter |
25 |
$11.70 per month |
1" Meter |
125 |
$29.10 per month |
1.5" Meter |
292 |
$58.16 per month |
2" Meter |
493 |
$93.13 per month |
3" Meter |
1,027 |
$186.05 per month |
4" Meter |
1,628 |
$290.62 per month |
6" Meter |
3,298 |
$581.20 per month |
8" Meter |
5,302 |
$908.52 per month |
|
Usage Rates |
Water Rate |
$0.2080 per cgal* above cgals included in minimum charge |
Irrigation Rate** |
$0.300 per cgal* above cgals included in minimum charge |
*cgal - 100 gallon
**Separate metering required to avoid sewer charges on irrigation or evaporative cooling tower uses.
Water surcharge outside City of Tallahassee - 50%. |
Brochures & Booklets
Design & Construction
Drinking Water
Stormwater
Wastewater
Version: 2471 (9/28/2016 3:53 PM) |