Sign In

 

Navigation Versions

Results 1 - 10 of 64
  • Traffic Camera Viewer 2

    10/24/2024

  • test1 task 891

    03/13/2024

  • Pension calculator - test

    08/23/2023

  • Pension Administration Termination

    08/10/2023

  • FAMU Way / Phase IV

    08/01/2023

    As part of its continuing commitment to make FAMU Way the most beautiful roadway in town, the City of Tallahassee is preparing plans for the final phase of the FAMU Way project (Phase IV), which begins near the east limits of FAMU Way Phase I (just west of S. Bronough Street) and ends at S. Monroe Street. The project shall provide a safe gateway for motorists, pedestrians and other corridor users, while upgrading underground utilities to address aging infrastructure. Roadway improvements include the add...

  • Seventh Avenue Water Main Replacement and Sixth Avenue Infrastructure Improvements

    07/31/2023

    As part of its commitment to ensuring reliable service, the City of Tallahassee Underground Utilities and Public Infrastructure department is planning utility and infrastructure improvements along Seventh Avenue between Centerville Road and N. Gadsden Street. The water main replacement project will upgrade approximately 4,500 linear feet of existing water main. The existing sanitary sewer will be rehabilitated with a cured-in-place (CIPP) lining. The roadway reconstruction of approximately 80 linear fee...

  • Test javascript

    07/06/2023

    DataSource: Conversion failed when converting from a character string to uniqueidentifier. DataSource: Conversion failed when converting from a character string to uniqueidentifier.

  • JavaScript Test Delete After Testing

    07/06/2023

    Description SiteAchitectureNavigation DataSource: Conversion failed when converting from a character string to uniqueidentifier.

  • Navigation Versions

    06/27/2023

    DataSource: Conversion failed when converting from a character string to uniqueidentifier.

  • Pullen Road Sidewalk Project

    03/23/2023

    To enhance safety and mobility options in the area, the City of Tallahassee is in the planning stage for sidewalk improvements along Pullen Road from Old Bainbridge Road to Fred Smith Road. Prior to the project moving to the design phase, the City is meeting with residents to gather input. This feedback will be used to inform the project’s design and next steps. At the meeting, City staff from the Underground Utilities & Public Infrastructure Department will be present to discuss the proposed sidewa...